Product Image

Heavy Duty Micro USB Charging Cable Braided Fast Phone Charger Long Lead 1M 2M

£2.69

✔Multiple Length Options – Choose from 0.5M, 1M, 2M, or 3M to suit your needs. ✔Durable Braided Design – Strong nylon braided exterior prevents tangling and increases lifespan. The strong braided outer layer protects against bending, twisting, and daily wear and tear.

Product Reviews

Name: Review: