Heavy Duty Micro USB Charging Cable Braided Fast Phone Charger Long Lead 1M 2M
£2.70
Lead 0.5M 1M 2M 3M. Available in 0.5m, 1m, 2m, and 3m for convenience in any situation. Available in both Micro USB and USB Type-C options, this cable is designed for fast charging and stable data transfer.