Site Logo
My Account | Wishlist | Basket
All Categories
Mobile Phone Accessories

Cables & Adapters

See More
PIXFAB
Mobile Phone Accessories - Cables & Adapters

  1. Home
  2. Mobile Phone Accessories
  3. Cables & Adapters
Product Image

USB Type C Fast Charging Charger Long Lead Cable For Pixel 9A 9 Pro XL 8A 7A 7

£2.95

If you are looking for a high quality premium product, then this cable is for you. · USB 3.1 Type C Male Connector to USB 2.0 A Male Data Cable. · USB Type C Male Connector to Type A Male Data Cable.

Product Reviews

Name: Review:

Related Products

3 Pcs Type-C to Type-C Fast Charging Cable 1m USB Type-C Fast Charging

3 Pcs Type-C to Type-C Fast Charging Cable 1m USB Type-C Fast Charging

£9.99

Galaxy A26/A16/A16 5g/A15/A15 5g Charger Plug, USB + Type C Fast Charger 20W USB C Travel Fast Charging Power Adapter With Dual Ports Plug USB C Phone Charger For Samsung Galaxy A16/A15 (WHITE)

Galaxy A26/A16/A16 5g/A15/A15 5g Charger Plug, USB + Type C Fast Charger 20W USB C Travel Fast Charging Power Adapter With Dual Ports Plug USB C Phone Charger For Samsung Galaxy A16/A15 (WHITE)

£8.99

45W Charger For Google Pixel 10 9 8 7 Fast Charger Plug USB Type C Fast Charging Cable [2M] High Speed Adapter UK 3 Pin Pixel 10 Pro Xl Fold 9 Pro Xl Fold 10a 9a 8a 7a 6a 5a 4a 6 5 4 Pro XL USB C Plug

45W Charger For Google Pixel 10 9 8 7 Fast Charger Plug USB Type C Fast Charging Cable [2M] High Speed Adapter UK 3 Pin Pixel 10 Pro Xl Fold 9 Pro Xl Fold 10a 9a 8a 7a 6a 5a 4a 6 5 4 Pro XL USB C Plug

£10.99

JuicEBitz® Extra Long USB Type C to USB Type C Fast Charging Charger Cable Lead

JuicEBitz® Extra Long USB Type C to USB Type C Fast Charging Charger Cable Lead

£8.49

USB Type C Fast Charge Cable 25cm Braided USB-A to USB-C Short Black 3A

USB Type C Fast Charge Cable 25cm Braided USB-A to USB-C Short Black 3A

£3.95

UGREEN 130W USB C Car Charger For  Xiaomi iPhone  PD3.0 USB Type C Fast Charging

UGREEN 130W USB C Car Charger For Xiaomi iPhone PD3.0 USB Type C Fast Charging

£14.99

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyaPhone.uk 2026