Site Logo
My Account | Wishlist | Basket
All Categories
Mobile Phone Accessories

Cables & Adapters

  1. Home
  2. Mobile Phone Accessories
  3. Cables & Adapters
Product Image

USB Type C Charging Cable For Apple iPhone 15 Pro Max Plus Long Lead UK

£4.59

Standard charging cables only provide the standard charging speed. iPhone 15 | iPhone 15 Plus | iPhone 15 Pro | iPhone 15 Pro Max | Samsung | HuaWei | XiaoMi and many phones that use the Type C interface.

Product Reviews

Name: Review:

Related Products

NUOBESTY USB Type-c Charging Station Dock, USB C Stand for Windows Smartphones and Type-c Devices, 5v 1a Desktop Phone Holder Charger, Abs Plastic and Alloy, Bedroom or Kitchen Use

NUOBESTY USB Type-c Charging Station Dock, USB C Stand for Windows Smartphones and Type-c Devices, 5v 1a Desktop Phone Holder Charger, Abs Plastic and Alloy, Bedroom or Kitchen Use

£6.19

StarTech.com USB C To USB C Cable - 3 ft / 1m - USB-IF Certified - 5A PD - USB 2.0 - USB Type C Charging Cable - USB C Fast Charge Cable (USB2C5C1M)

StarTech.com USB C To USB C Cable - 3 ft / 1m - USB-IF Certified - 5A PD - USB 2.0 - USB Type C Charging Cable - USB C Fast Charge Cable (USB2C5C1M)

£12.08

StarTech.com USB C To USB C Cable - 10 ft / 3m - USB-IF Certified - 5A PD - USB 2.0 - USB Type C Charging Cable - USB C Fast Charge Cable (USB2C5C3M)

StarTech.com USB C To USB C Cable - 10 ft / 3m - USB-IF Certified - 5A PD - USB 2.0 - USB Type C Charging Cable - USB C Fast Charge Cable (USB2C5C3M)

£20.94

Belkin BoostCharge Braided USB C charger cable USB-C to USB-A cable USB type C charging cable for iPhone 15 Samsung Galaxy S23 Google Pixel iPad

Belkin BoostCharge Braided USB C charger cable USB-C to USB-A cable USB type C charging cable for iPhone 15 Samsung Galaxy S23 Google Pixel iPad

£14.77

USB C Plug, 25W Power Adapter USB C Fast Charger UK iPhone Plug Dual Port USB+Type-C Charging Wall Plug Fast Charge for iPhone 17/16/15/14 Pro/14 Pro Max/13/12/11, iPad Pro/Air, Galaxy S24/S23

USB C Plug, 25W Power Adapter USB C Fast Charger UK iPhone Plug Dual Port USB+Type-C Charging Wall Plug Fast Charge for iPhone 17/16/15/14 Pro/14 Pro Max/13/12/11, iPad Pro/Air, Galaxy S24/S23

£6.99

45W Super Fast USB C Charger for Samsung Galaxy S26 Ultra/S26+/S26/S25/S25+/S25 Ultra/S24/S24 Ultra/S23/S22/A55/A54/A15/A14, USB C Super Fast Charger with USB Type C Charging Cable and Plug Charge

45W Super Fast USB C Charger for Samsung Galaxy S26 Ultra/S26+/S26/S25/S25+/S25 Ultra/S24/S24 Ultra/S23/S22/A55/A54/A15/A14, USB C Super Fast Charger with USB Type C Charging Cable and Plug Charge

£7.98

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyaPhone.uk 2026