Site Logo
My Account | Wishlist | Basket
All Categories
Mobile Phone Accessories

Chargers & Docks

  1. Home
  2. Mobile Phone Accessories
  3. Chargers & Docks
Product Image

USB Type C Charging Cable Braided Fast Phone Charger HeavyDuty Long Lead 1m-3m

£3.39

Product Reviews

Name: Review:

Related Products

USB C Plug, 25W Power Adapter USB C Fast Charger UK iPhone Plug Dual Port USB+Type-C Charging Wall Plug Fast Charge for iPhone 17/16/15/14 Pro/14 Pro Max/13/12/11, iPad Pro/Air, Galaxy S24/S23

USB C Plug, 25W Power Adapter USB C Fast Charger UK iPhone Plug Dual Port USB+Type-C Charging Wall Plug Fast Charge for iPhone 17/16/15/14 Pro/14 Pro Max/13/12/11, iPad Pro/Air, Galaxy S24/S23

£6.99

45W Super Fast USB C Charger for Samsung Galaxy S26 Ultra/S26+/S26/S25/S25+/S25 Ultra/S24/S24 Ultra/S23/S22/A55/A54/A15/A14, USB C Super Fast Charger with USB Type C Charging Cable and Plug Charge

45W Super Fast USB C Charger for Samsung Galaxy S26 Ultra/S26+/S26/S25/S25+/S25 Ultra/S24/S24 Ultra/S23/S22/A55/A54/A15/A14, USB C Super Fast Charger with USB Type C Charging Cable and Plug Charge

£7.98

Super Fast USB C Charger for Samsung S26 S25 S24, 25W USB C Super Fast Charger with USB Type C Charging Cable and Plug Charge for Samsung Galaxy S26+/S25+/S24/S23/S22 /S21/S20 Ultra/A56/A55/A25/A26

Super Fast USB C Charger for Samsung S26 S25 S24, 25W USB C Super Fast Charger with USB Type C Charging Cable and Plug Charge for Samsung Galaxy S26+/S25+/S24/S23/S22 /S21/S20 Ultra/A56/A55/A25/A26

£5.99

HeavyDuty USB Type - C Charging Cable Metal type Fast Phone Charger Long Lead 1M

HeavyDuty USB Type - C Charging Cable Metal type Fast Phone Charger Long Lead 1M

£3.99

Usb Type C charging Cable Compatible For iPhone 14/13/12/11  Fast charging 2M

Usb Type C charging Cable Compatible For iPhone 14/13/12/11 Fast charging 2M

£3.39

AirPods Pro 3 MagSafe Charging Case ANC Spatial Audio USB Type C Charging Boxed

AirPods Pro 3 MagSafe Charging Case ANC Spatial Audio USB Type C Charging Boxed

£151.50

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyaPhone.uk 2026