Site Logo
My Account | Wishlist | Basket
All Categories
Mobile Phone Accessories

Other Mobile Accessories

  1. Home
  2. Mobile Phone Accessories
  3. Other Mobile Accessories
Product Image

USB C Type C 2m 1m 1.5m Charging Cable Fast Mobile Phone Charger Long Lead Wire

£3.76

It is not the original cable and cannot be used to the power bank. The product doesn't support for iPhone phone ,ipad and notebook, and cannot be used in the car!

Product Reviews

Name: Review:

Related Products

2 IN 1 USB C Type C Splitter to Dual Type USB C Headphone Jack Audio Adapter

2 IN 1 USB C Type C Splitter to Dual Type USB C Headphone Jack Audio Adapter

£3.29

2 IN 1 USB C Type C Splitter to Dual Type USB C Headphone Jack Audio Adapter

2 IN 1 USB C Type C Splitter to Dual Type USB C Headphone Jack Audio Adapter

£2.70

chenyang USB C Type-C Host OTG to USB 3.0 Type B Extension Data Cable for SSD Disk 1.0M 5Gbps

chenyang USB C Type-C Host OTG to USB 3.0 Type B Extension Data Cable for SSD Disk 1.0M 5Gbps

£13.93

NFHK 13cm USB 2.0 Type-A Male to USB-C Type-C Male Male Data Flat Slim FPC Cable for FPV & Disk & Phone

NFHK 13cm USB 2.0 Type-A Male to USB-C Type-C Male Male Data Flat Slim FPC Cable for FPV & Disk & Phone

£7.18

Aux to USB C, Type C to 3.5mm Audio Jack Cable Extension Cord for Car Stereo,Headphone,Speakers Compatible with Samsung Galaxy S21 S20 Ultra Note 20/10, iPad Pro, Huawei 1.2M (Aux to USB C 1 Pack)

Aux to USB C, Type C to 3.5mm Audio Jack Cable Extension Cord for Car Stereo,Headphone,Speakers Compatible with Samsung Galaxy S21 S20 Ultra Note 20/10, iPad Pro, Huawei 1.2M (Aux to USB C 1 Pack)

£3.99

Juice USB-C Type-C 2M 60W Fast Charge & Sync Cable USB-C iPhone iPad Samsung

Juice USB-C Type-C 2M 60W Fast Charge & Sync Cable USB-C iPhone iPad Samsung

£7.99

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyaPhone.uk 2026