Site Logo
My Account | Wishlist | Basket
All Categories
Mobile Phone Accessories

Cables & Adapters

  1. Home
  2. Mobile Phone Accessories
  3. Cables & Adapters
Product Image

USB C to Type C Cable Fast Charger Long Lead For Apple iPhone 17 17e 16 Pro Max

£3.95

· USB Type C Male Connector to Type C Male Data Cable. If you are looking for a high quality premium product, then this cable is for you. The durable and sturdy nylon fibre ensures a long lifespan and provides reliably and stably charging.

Product Reviews

Name: Review:

Related Products

USB C to C Cable, Type C Fast Charging Cables, PD 3A USB C to Type C Charger Cable for Samsung Galaxy S25 S24 S23 S22 S21 S20 S24Ultra, A56 A55 A05s A06 A54 A53 A34 A33 A23 A16 (2m-1Pack)

USB C to C Cable, Type C Fast Charging Cables, PD 3A USB C to Type C Charger Cable for Samsung Galaxy S25 S24 S23 S22 S21 S20 S24Ultra, A56 A55 A05s A06 A54 A53 A34 A33 A23 A16 (2m-1Pack)

£3.99

Greabuy Type C to USB Male Female Adapter USB C to Type C Male Female Data Converter

Greabuy Type C to USB Male Female Adapter USB C to Type C Male Female Data Converter

£5.99

iPhone 17 16 15 Charger,USB C Fast Charger Plug,2Pack 20W Dual Port Power Type C UK Wall Charger Adapter with 2M USB C to Type C Cord Compatible with iPhone 17Air/17 16 15 Pro Max/iPad/S25 Ultra/S24

iPhone 17 16 15 Charger,USB C Fast Charger Plug,2Pack 20W Dual Port Power Type C UK Wall Charger Adapter with 2M USB C to Type C Cord Compatible with iPhone 17Air/17 16 15 Pro Max/iPad/S25 Ultra/S24

£11.99

iPhone 15 16 17 Fast Charger, 20W USB C Charger Plug with 2M Nylon USB C to Type C Cable for iPhone 17/16/16 Plus/16e/16 Pro Max/15/15 Plus/iPad, Type C Plug UK Power Adapter and Nylon Braided Cable

iPhone 15 16 17 Fast Charger, 20W USB C Charger Plug with 2M Nylon USB C to Type C Cable for iPhone 17/16/16 Plus/16e/16 Pro Max/15/15 Plus/iPad, Type C Plug UK Power Adapter and Nylon Braided Cable

£8.99

USB-C to Type C Fast Charger & Data Cables up to USB 3.2 Cable

USB-C to Type C Fast Charger & Data Cables up to USB 3.2 Cable

£8.06

25W Fast Charger USB C Plug UK Compatible with Samsung Galaxy S25 S24 Ultra S23 S22 S21 FE S20 A05S A12 A13 A14 A15 A16 A20E A33 A34 A35 A52 A55 Charger With 2M Cable Cable USB C to Type C

25W Fast Charger USB C Plug UK Compatible with Samsung Galaxy S25 S24 Ultra S23 S22 S21 FE S20 A05S A12 A13 A14 A15 A16 A20E A33 A34 A35 A52 A55 Charger With 2M Cable Cable USB C to Type C

£7.99

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyaPhone.uk 2026