Product Image

USB-C Charger Cable Type-C HeavyDuty Charging Data Sync Phone Long Lead 1m 2m

£3.99

Cyber Tech Presents it’s Fast Charging Type C USB Cable. Enjoy fast charging and quick synching with our Nylon Braided Cable. The durable sheath made of braided nylon gives it a stylish look, prevents tangling, withstands 10,000+ bends and more than 10,000 connector tests to ensure durability.

Product Reviews

Name: Review: