Site Logo
My Account | Wishlist | Basket
All Categories
Mobile Phone Accessories

Cables & Adapters

  1. Home
  2. Mobile Phone Accessories
  3. Cables & Adapters
Product Image

USB A to Type C Charging Cable For Samsung Braided Fast Phone Charger Long Lead

£6.95

Nylon braided USB C cable With aluminium alloy shell. Braided Nylon fiber, the most flexible, powerful and durable material. Material - Nylon Braided Wire. These flexible 10cm / 1m / 2m / 3m Durable and Tangle-Free USB C leads are.

Product Reviews

Name: Review:

Related Products

Liaoan Weiyu USB C to USB A 3.0 OTG Adapter, USB C to Micro Adapter, IP to Type-C Adapter, and USB A to Type-C OTG 3.0 Adapter (6-Piece Set), Supporting Fast Charging and Data Transfer.

Liaoan Weiyu USB C to USB A 3.0 OTG Adapter, USB C to Micro Adapter, IP to Type-C Adapter, and USB A to Type-C OTG 3.0 Adapter (6-Piece Set), Supporting Fast Charging and Data Transfer.

£21.38

Liaoan USB C to USB A 3.0 OTG Adapter, USB C to Micro Adapter, IP to Type-C Adapter, and USB A to Type-C OTG 3.0 Adapter (6-Piece Set), Supporting Fast Charging and Data Transfer.

Liaoan USB C to USB A 3.0 OTG Adapter, USB C to Micro Adapter, IP to Type-C Adapter, and USB A to Type-C OTG 3.0 Adapter (6-Piece Set), Supporting Fast Charging and Data Transfer.

£20.89

240W 0.3m/1m/2m Quike Charging USB Type-C To Type-C Data Cable USB A to Type C

240W 0.3m/1m/2m Quike Charging USB Type-C To Type-C Data Cable USB A to Type C

£4.69

USB 3.2 10Gbps Type C Cable USB A to Type-C 3.2 Gen2 Fast Data Cable For Samsung

USB 3.2 10Gbps Type C Cable USB A to Type-C 3.2 Gen2 Fast Data Cable For Samsung

£3.65

USB3.2 10Gbps Type C Cable USB A to Type-C 3.2 Data Transfer Hard Disk Cable UK

USB3.2 10Gbps Type C Cable USB A to Type-C 3.2 Data Transfer Hard Disk Cable UK

£4.51

2 in 1 Dual Type-C Splitter Cable 6A USB A To Type C Fast Charging Data Nylon uk

2 in 1 Dual Type-C Splitter Cable 6A USB A To Type C Fast Charging Data Nylon uk

£4.37

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyaPhone.uk 2026