Site Logo
My Account | Wishlist | Basket
All Categories
Mobile Phone Accessories

Cables & Adapters

  1. Home
  2. Mobile Phone Accessories
  3. Cables & Adapters
Product Image

USB A to Type C Cable 5A 100W Fast Charger Braided Long Lead For Apple Samsungs

£6.99

We'll be more than happy to satisfy you. If you face any of the following issues like. Item not received.

Product Reviews

Name: Review:

Related Products

Liaoan USB C to Micro Adapter, USB A to Type-C 3.0 OTG Converter, IP to USB C Converter, and Type-C to USB A OTG 3.0 Adapter (6 Pieces), Supporting Fast Charging and Data Transfer

Liaoan USB C to Micro Adapter, USB A to Type-C 3.0 OTG Converter, IP to USB C Converter, and Type-C to USB A OTG 3.0 Adapter (6 Pieces), Supporting Fast Charging and Data Transfer

£16.99

USB 3.2 10Gbps Type C Cable USB A to Type-C 3.2 Gen2 Fast Data Cable For Samsung

USB 3.2 10Gbps Type C Cable USB A to Type-C 3.2 Gen2 Fast Data Cable For Samsung

£2.65

USB 3.2 10Gbps Type C Cable USB A to Type-C 3.2 Gen2 Fast Data Cable For Samsung

USB 3.2 10Gbps Type C Cable USB A to Type-C 3.2 Gen2 Fast Data Cable For Samsung

£3.55

2 in 1 Dual Type-C Splitter Cable 6A USB A To Type C Fast Charging Data Nylon uk

2 in 1 Dual Type-C Splitter Cable 6A USB A To Type C Fast Charging Data Nylon uk

£4.22

USB3.2 10Gbps Type C Cable USB A to Type-C 3.2 Data Transfer Hard Disk Cable UK

USB3.2 10Gbps Type C Cable USB A to Type-C 3.2 Data Transfer Hard Disk Cable UK

£3.49

20AWG USB A To Type C USB-C FAST CHARGE 3A+ Charging Cable Short 0.2m BLACK

20AWG USB A To Type C USB-C FAST CHARGE 3A+ Charging Cable Short 0.2m BLACK

£3.85

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyaPhone.uk 2026