Site Logo
My Account | Wishlist | Basket
All Categories
Mobile Phone Accessories

Cables & Adapters

  1. Home
  2. Mobile Phone Accessories
  3. Cables & Adapters
Product Image

USB A to Type C 3.1A Fast Charging Cable Nylon Braided Long Lead 15CM 1M 2M 3M

£3.99

USB Type C 3.1A Fast Braided Nylon Charging Cable Long Lead 15CM 1M 2M 3M for Compatible with iPhone, Samsung, OnePlus, Xiaomi, Honour, Huawei, Asus, Google, and All Type-C Compatible Devices. Multiple Length Options – Available in 15cm, 1m, 2m, and 3m to suit your needs.

Product Reviews

Name: Review:

Related Products

Liaoan Weiyu USB C to USB A 3.0 OTG Adapter, USB C to Micro Adapter, IP to Type-C Adapter, and USB A to Type-C OTG 3.0 Adapter (6-Piece Set), Supporting Fast Charging and Data Transfer.

Liaoan Weiyu USB C to USB A 3.0 OTG Adapter, USB C to Micro Adapter, IP to Type-C Adapter, and USB A to Type-C OTG 3.0 Adapter (6-Piece Set), Supporting Fast Charging and Data Transfer.

£21.29

Liaoan USB C to USB A 3.0 OTG Adapter, USB C to Micro Adapter, IP to Type-C Adapter, and USB A to Type-C OTG 3.0 Adapter (6-Piece Set), Supporting Fast Charging and Data Transfer.

Liaoan USB C to USB A 3.0 OTG Adapter, USB C to Micro Adapter, IP to Type-C Adapter, and USB A to Type-C OTG 3.0 Adapter (6-Piece Set), Supporting Fast Charging and Data Transfer.

£20.89

240W 0.3m/1m/2m Quike Charging USB Type-C To Type-C Data Cable USB A to Type C

240W 0.3m/1m/2m Quike Charging USB Type-C To Type-C Data Cable USB A to Type C

£4.69

USB 3.2 10Gbps Type C Cable USB A to Type-C 3.2 Gen2 Fast Data Cable For Samsung

USB 3.2 10Gbps Type C Cable USB A to Type-C 3.2 Gen2 Fast Data Cable For Samsung

£3.65

20Gbps USB C 3.2 Gen 2 Cable 30cm 2Pack, 90 Degree USBC to USBC Short Cable 4K@60Hz Video, 240W Charging USB A to Type-C Charger Cord, for Thunderbolt 4 MacBook, Monitor, iPad, iPhone 17, Galaxy S26

20Gbps USB C 3.2 Gen 2 Cable 30cm 2Pack, 90 Degree USBC to USBC Short Cable 4K@60Hz Video, 240W Charging USB A to Type-C Charger Cord, for Thunderbolt 4 MacBook, Monitor, iPad, iPhone 17, Galaxy S26

£14.99

USB3.2 10Gbps Type C Cable USB A to Type-C 3.2 Data Transfer Hard Disk Cable UK

USB3.2 10Gbps Type C Cable USB A to Type-C 3.2 Data Transfer Hard Disk Cable UK

£2.99

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyaPhone.uk 2026