Product Image

HeavyDuty USB Type C Charging Cable Braided Fast Phone Charger Long Lead 1m 2m

£2.51

Durable Nylon Braided Design: Premium double-braided nylon jacket prevents tangling, resists wear, and withstands over 30,000 bends. Premium braided anti-tangle design. Mi 14 / Mi 13 / Redmi Note 13 / 12 / 11 / 10 Series.

Product Reviews

Name: Review: