Site Logo
My Account | Wishlist | Basket
All Categories
Mobile Phone Accessories

Cables & Adapters

  1. Home
  2. Mobile Phone Accessories
  3. Cables & Adapters
Product Image

HeavyDuty 90 USB Type C Charging Cable Braided Fast Phone Charger Long Lead 2m3m

£2.48

The angled connector provides a convenient cable position while using compatible devices, making it suitable for gaming, watching videos, browsing, and general charging tasks. Woven cable construction.

Product Reviews

Name: Review:

Related Products

HeavyDuty 90 USB Type C Charging Cable Braided Fast Phone Charger Long Lead 2m3m

HeavyDuty 90 USB Type C Charging Cable Braided Fast Phone Charger Long Lead 2m3m

£2.89

HeavyDuty 90 USB Type C Charging Cable Braided Fast Phone Charger Long Lead 2m3m

HeavyDuty 90 USB Type C Charging Cable Braided Fast Phone Charger Long Lead 2m3m

£2.15

Tobfit USB C 90° Adapter, Type C to Type C 4.0 40Gbps, 2 Pack 90 Degree USB C Angle Plug for Laptop, Tablet, Phone, Mobile Phone(B)

Tobfit USB C 90° Adapter, Type C to Type C 4.0 40Gbps, 2 Pack 90 Degree USB C Angle Plug for Laptop, Tablet, Phone, Mobile Phone(B)

£11.87

AIYEEN 10Gbps USB3.1 Adapter 90 Degree (2 Pack), Up and Down Angle 90 Degree USB Type A Male to USB-C Female Coupler Adapters, 120W Fast Charging OTG Converter (USB 3.1 Up Down)

AIYEEN 10Gbps USB3.1 Adapter 90 Degree (2 Pack), Up and Down Angle 90 Degree USB Type A Male to USB-C Female Coupler Adapters, 120W Fast Charging OTG Converter (USB 3.1 Up Down)

£8.99

TechExpert USB Type C OTG Data Cable 90° to USB 3.0 Female for All Devices with USB Type C Port

TechExpert USB Type C OTG Data Cable 90° to USB 3.0 Female for All Devices with USB Type C Port

£6.07

For Honor 600 400 200 Lite 200 Pro 200 90 90 Smart X8 X8a X7b X6a X6 X6b Magic8 7 6 5 Pro Lite Charger Plug [25W] Super Fast Charger Plug USB Type C Fast Charging Cable [1M] High Speed Plug UK 3 Pin

For Honor 600 400 200 Lite 200 Pro 200 90 90 Smart X8 X8a X7b X6a X6 X6b Magic8 7 6 5 Pro Lite Charger Plug [25W] Super Fast Charger Plug USB Type C Fast Charging Cable [1M] High Speed Plug UK 3 Pin

£9.99

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyaPhone.uk 2026