Heavy Duty USB Type C Charging Cable Fast Phone Charger Long Lead 2m to 14m
£2.99
This charging cable does not support charging for iPhone 15, 16, 17 series, or iPad series. Colour: White. Note: As the data cable is cut manually, the error is about 20cm. the actual length of 3m is about 2.8m and so on.