Site Logo
My Account | Wishlist | Basket
All Categories
Mobile Phone Accessories

Cables & Adapters

  1. Home
  2. Mobile Phone Accessories
  3. Cables & Adapters
Product Image

3 Pack Heavy Duty USB Type C Charging Cable Braided Fast Phone Long Lead 2m 1m

£9.99

Cable Lengths: 1M, 2M. Braided nylon construction enhances flexibility and durability, with a tensile strength increase of 200%. Material: Nylon Braided. Supports standard charging speeds up to 15W.

Product Reviews

Name: Review:

Related Products

iPhone Charger Cable Fast Charge 3 Pack Heavy Duty Cable 1M,2M,3M MFI-Certified

iPhone Charger Cable Fast Charge 3 Pack Heavy Duty Cable 1M,2M,3M MFI-Certified

£7.99

iPhone Charger Cable Fast Charge 3 Pack Heavy Duty Cable 1M,2M,3M MFI-Certified

iPhone Charger Cable Fast Charge 3 Pack Heavy Duty Cable 1M,2M,3M MFI-Certified

£10.99

iPhone Charger Cable Fast Charge 3 Pack Heavy Duty Cable 1M,2M,3M MFI-Certified

iPhone Charger Cable Fast Charge 3 Pack Heavy Duty Cable 1M,2M,3M MFI-Certified

£10.99

iPhone Charger Cable Fast Charge 3 Pack Heavy Duty Cable 1M,2M,3M MFI-Certified

iPhone Charger Cable Fast Charge 3 Pack Heavy Duty Cable 1M,2M,3M MFI-Certified

£9.99

50000mAh Solar Portable Charger, 120W Fast Charging Bank with Built-In Cables, LED Light, 4 Outputs and 3 Inputs, Heavy-Duty Rechargeable Battery for Phones Tablets Camping Hiking Travel Outdoor

50000mAh Solar Portable Charger, 120W Fast Charging Bank with Built-In Cables, LED Light, 4 Outputs and 3 Inputs, Heavy-Duty Rechargeable Battery for Phones Tablets Camping Hiking Travel Outdoor

£29.38

Iokmax for Samsung Galaxy A17 5G/ A26 5G Phone Case with 2 Pack Screen Protector, Military Grade Shockproof, Heavy Duty Robust Bumper Cover with Kickstand for Samsung A17/ A26 5G Case, Black

Iokmax for Samsung Galaxy A17 5G/ A26 5G Phone Case with 2 Pack Screen Protector, Military Grade Shockproof, Heavy Duty Robust Bumper Cover with Kickstand for Samsung A17/ A26 5G Case, Black

£9.99

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyaPhone.uk 2026