Site Logo
My Account | Wishlist | Basket
All Categories
Mobile Phone Accessories

Cables & Adapters

  1. Home
  2. Mobile Phone Accessories
  3. Cables & Adapters
Product Image

100W 7A USB to Type C Super Fast Charging Cable Phone Charger Long Lead 1m2m 3m

£3.99

✔ Available in 2M & 3M Lengths. 1 × Heavy Duty USB Type-C Charging Cable. Product Type USB Type-C Charging Cable. ✔ Fast Charging & High-Speed Data Sync. Length 2M / 3M (As Selected). ✔ Extra Long 2M & 3M Options.

Product Reviews

Name: Review:

Related Products

100W 90° USB to Type C Fast Charging Cable | Right Angle PD Super Charger Lead

100W 90° USB to Type C Fast Charging Cable | Right Angle PD Super Charger Lead

£2.80

BASESAILOR Multi USB Charging Adapter Kit,USB to USBC Adaptor Set,0.3M 100W Charger Cable,Type C to USB 3.0 OTG Converter,USB C to iOS Micro,Portable Travel Case Box for iPhone 17 Air 16 15 Pro Max

BASESAILOR Multi USB Charging Adapter Kit,USB to USBC Adaptor Set,0.3M 100W Charger Cable,Type C to USB 3.0 OTG Converter,USB C to iOS Micro,Portable Travel Case Box for iPhone 17 Air 16 15 Pro Max

£13.99

Bacron 100W PD USB C to DC Adapter 5.5 x 1.7 mm, USB C Female to DC 19V Male Adapter, Type USB C to 5.5 x 1.7 mm Adapter made for Acer Laptop Series

Bacron 100W PD USB C to DC Adapter 5.5 x 1.7 mm, USB C Female to DC 19V Male Adapter, Type USB C to 5.5 x 1.7 mm Adapter made for Acer Laptop Series

£6.85

Bacron 100W PD USB C to DC Adapter 6.3 x 3.0 mm, USB C Female to DC 19V Male Adapter, Type USB C to 6.3 x 3.0 mm Adapter made for Toshiba Laptop Series

Bacron 100W PD USB C to DC Adapter 6.3 x 3.0 mm, USB C Female to DC 19V Male Adapter, Type USB C to 6.3 x 3.0 mm Adapter made for Toshiba Laptop Series

£7.85

Bacron 100W PD USB C to DC Adapter Rectangle Plug 20V, PD Type C Female to DC 20V Male Adapter, Type USB C to Rectangle Plug Adapter made for Lenovo ThinkPad Laptop Series

Bacron 100W PD USB C to DC Adapter Rectangle Plug 20V, PD Type C Female to DC 20V Male Adapter, Type USB C to Rectangle Plug Adapter made for Lenovo ThinkPad Laptop Series

£8.85

Bacron 100W PD USB C to DC Adapter 6.3 x 3.0 mm, Type C Female to DC 19V Male, Type USB C to 6.3 x 3.0mm Adapter made for Toshiba Laptop Series

Bacron 100W PD USB C to DC Adapter 6.3 x 3.0 mm, Type C Female to DC 19V Male, Type USB C to 6.3 x 3.0mm Adapter made for Toshiba Laptop Series

£8.85

Privacy Policy

All third-party product, company names and logos are trademarks™ or registered® trademarks and remain the property of their respective holders. Use of them does not imply any affiliation with or endorsement by them. All references to third party trademarks are intended to constitute nominative fair use under applicable trademark laws.

Content is provided ‘as is’ and is subject to change or removal at any time.

© buyaPhone.uk 2026